News

25/01/2011

Geocon Bulgaria in CeBit 2011

Geocon Bulgaria will participate in Cebit 2011, one of the most prestigious and largest fair for Information Technology, which will be held from 1st till 5th of March in Hannover, Germany. ...read
15/07/2010

The official site of GeoCon Bulgaria Ltd was successfully redesigned

The official site of GeoCon Bulgaria Ltd was successfully redesigned. Our main goal was to combine the readability of information about our products and services with the latest innovations in creating a modern look on the web. This was realized with the help of Amigo Style Ltd. The new vision......read
14/05/2010

Innovations in Geocon PlanExpert 2.8 beta

As modern software solution for schedule planning, Geocon PlanExpert 2.8 beta optimizes the shifts organization for a huge number of employees. The new version (2. offers additional functionalities developed and based on the feedback with our clients and managing their specific requirements.......read

Contacts

Address:
2A, floor 2 Boris Hristov str.
1111 Sofia
Bulgaria

Contact phone:
+359 (0) 2 / 845 91 00

Fax: +359 (0) 2 / 845 91 02

E-Mail: office@geocon-bg.com

FAQ

» An employees weekly hours worked changes as of day X. Where can the validity date be modified beforehand?

» During the expansion of my personnel base only 2 more employees could be added after that the button - new was blocked (inverted), why?

»  How can archived employees be reactivated?

» How can the jobbing work force be included in the schedule?

» How do I calculate shifts which will end in a new planning time frame? (Example: Planning time frame = month, Shift = night shift from the 31st of the planning month to the 1st of the following month.)

» I would like to modify a schedule but I can't enter changes. Why?

»  I've initiated the automatic completion of my schedule. Some employees don't have entered shifts.

» If employee X is off every second weekend where can that be entered?

»  The structural units of our installation do not correspond with the given units; station and group. Where can these given units be changed?

» What does the message "Internal error" mean?

» What is the procedure for employees which are moved to a different area on short term within the planning time frame?

»  Where are the hours of the previous planning stored after the planning has been initiated with GeoCon PlanExpert?

» Where are the second shift time and the break entered during parted shifts?

» Where can I find information as to which version of GeoCon PlanExpert is installed on my system?